How do I plan a van build?

Updated

Start with the van, who is traveling, and the trips. Power, payload, and the order of work come after those, not before. Get a number for your own van once those are written down, and treat every number as a planning estimate until a manual or a scale ticket replaces it.

Get these numbers for your own van, no account needed.

The order

  1. Write down the van and the trips. Make, length, roof, who travels, which seasons, how long between hookups, and the budget. How much a van conversion costs is how this planner builds that total. Most later questions trace back to two or three of those. That list is what "it depends" depends on.
  2. Weigh the empty van, or start from the door label. Brochure payload is for a base van. How payload is counted. A Sprinter 170 high roof has a worksheet from this planner's North America catalog. A Transit high roof has a worksheet. A ProMaster high roof has a worksheet.
  3. Draw the layout before the parts that set other dimensions. Fridge, mattress, fan, and windows come before batteries, solar, and cabinet lumber. What to buy first. The bed is its own choice: fixed, or a lift. An upright fridge needs a mount into structure, not cabinet skin.
  4. Add up one day of power, then the battery and the roof. Daily watt-hours come first. Two people and a remote-work day are on the battery-size page. The inverter class for the biggest load at one moment is what size inverter a van needs. Solar follows the day and the season. Charging while you drive is the alternator question and the DC-DC charger size.
  5. Put the roof in order before you cut. The fan, the rack, and the panels share it. When to cut.
  6. Get the numbers for your van, then look at a finished plan. First numbers runs this planner's payload, daily energy, battery, and solar math for a Sprinter, Transit, or ProMaster. No account. A complete Sprinter 170 plan, with the floor plan and the reasons kept next to the choices, is the example. The checks that have to run in one pass are what a van build planner should check.
  7. Mark which figures are still estimates. A planning estimate is for choosing and budgeting. It is not the drawing you wire or cut from. Where that line is.

Worked sample (planning estimates)

A couple, longer trips, a high-roof cargo van, some nights away from hookups, propane cooking, and laptops during the day. The sequence above is the plan. The numbers are not one size.

  • Payload for a 2019–2026 Sprinter Cargo 2500 170 high roof, in this catalog, is 3,792 lb before the build is added. The worksheet spends that on one longer-trip build.
  • The Transit high-roof lengths in this catalog are on the Transit worksheet. That page spends the 148 high roof on the same kind of longer-trip build.
  • The ProMaster high roofs in this catalog are on the ProMaster worksheet. That page spends the 136 high roof on the same kind of longer-trip build.
  • The same kind of trip with a remote-work day lands on a 500 Ah 12 V bank in this planner, the next 100 Ah step. That sample is the battery page, not the shorter load list on the power page.

Change the van, the trips, or one large load and both numbers move. That is the point of writing the inputs down before buying the bank or the lumber.

When to bring in a professional

Planning can stay with you. High-current wiring, shore power, seats and seat belts, roof or body cuts that touch structure, and fuel or exhaust need a qualified person to design or check before you connect or cut. The sequence tells you which of those your build has, so you can line up help before the parts arrive.

Ready when you are

Walk your own van through that sequence in Vansembly, one decision at a time.

Start your build

Have your van's make, length and roof handy if you know them.