Example plan.

Measured Spatial Plan

Dimensional top-down van layoutCab / cargo boundary: Orientation landmark at the sourced cargo-floor origin. It is context, not an invented cab intrusion.1710 mm display span. sourced geometry. Context only.Passenger sliding door clear opening: Protected factory opening. The fit engine keeps this exact profile geometry clear.450 mm display span. sourced geometry. Included in fit rules.Rear doors clear opening: Protected factory opening. The fit engine keeps this exact profile geometry clear.1549 mm display span. sourced geometry. Included in fit rules.Driver rear wheelhouse: Modeled wheel-well volume. Placed bodies and operating clearances are checked against it.450 mm display span. estimated geometry. Included in fit rules.Passenger rear wheelhouse: Modeled wheel-well volume. Placed bodies and operating clearances are checked against it.450 mm display span. estimated geometry. Included in fit rules.CAB / FRONTREAR DOORS

Four-season main plan

Revision 1 · 8 placed · cab at the top, rear doors at the bottom

In this layout

  • Driver-side galley
  • Wet bath
  • Side bench
  • Short queen platform
  • 500Ah battery bank
  • Dometic CFX5 55IM
  • Fresh-water tank
  • Rear gear garage
Fit check · 8 placed6 verification items

Fit claims use the active vehicle profile, installed finish build-up, component dimensions, operating envelopes, and their recorded tolerances. Open the planner for issue evidence and explicit fixes.

Weight & Payload

This payload is the same planning model as the first-numbers estimate for these choices. The parts below are example hardware, so their weights are not added again here.

2019–2026 Mercedes-Benz Sprinter Cargo 2500 170 High Roof, 3,792 lb payload

1,026 lb

OEM profile + estimated curb weight · likely payload 3,414 lb to 3,792 lb · planning weight band 2,512 lb to 3,020 lb

Axle conclusion unavailable until front/rear GAWR and empty front/rear scale weights are entered.

To improve confidence

  • Enter GVWR, front GAWR, and rear GAWR from this van’s certification label.
  • Weigh the empty van by axle before relying on axle margins.
  • Create an active spatial plan before relying on front/mid/rear weight distribution.
  • Replace estimated component, materials, and gear weights with measured values; each estimated line carries a ±20% planning band, combined with the vehicle's payload range as independent uncertainties.
Components 537 lbWater 379 lbBuild materials 1,210 lbPeople & gear 640 lbProjected loaded range: 7,770 lb–8,479 lb of 9,050 lb GVWR

Where the weight sits (unavailable without a spatial plan)

Front 582 lbMid 484 lbRear 484 lb (31%)

1,216 lb is not spatially placed: 500Ah LiFePO4 bank, 2,000 W inverter, 800W solar array + mounts, 12V fridge, Roof vent fan, Diesel heater (installed), Water pump, Induction cooktop, Roof rack, Small electrical parts, Fresh water, full (40 gal), Water tanks (empty shells), Gear & supplies (2 × 150 lb). This weight is excluded from directional and axle claims, not silently assigned to a guessed zone.

  • GVWR is manufacturer-sourced, but curb weight is a planning estimate that varies by options. Confirm the door placard and weigh the empty van before final sign-off. Use the individual door-jamb certification/tire labels as the final GVWR/GAWR authority. Published drawing dimensions are subject to OEM tolerance and do not include conversion finishes.
  • 500Ah LiFePO4 bank has weight but no spatial position. No exact axle conclusion is shown until it is placed.
Full weight breakdown (15 lines)
500Ah LiFePO4 bankest155 lbweight follows watt-hours (Battle Born 12 V class); a higher voltage does not cut the weight
2,000 W inverterest25 lbclass-typical
800W solar array + mountsest136 lb0.17 lb/W installed
12V fridgeest47 lbCFX3-class typical
Roof vent fanest16 lbMaxxFan-class typical
Diesel heater (installed)est18 lbunit + kit + ducting
Water pumpest4 lbShurflo-class
Induction cooktopest6 lbportable induction class, about 6 lb
Roof rackest75 lbrack once solar is past a bare-roof mount, about 75 lb
Small electrical partsest55 lbMPPT, DC-DC, cable, fuses, bus, and shunt, about 55 lb
Fresh water, full (40 gal)334 lb8.34 lb/gal. RVIA counts fresh full
Water tanks (empty shells)est45 lb~0.7 lb per gal capacity, fresh + grey
Build materials (typical preset)est1,210 lbstructure only: insulation, floor, paneling, framing, cabinetry, bed. Electrical gear and appliances are their own lines
People (2 × 170 lb)340 lbplanning weight per person; fixed, not banded
Gear & supplies (2 × 150 lb)est300 lbtrip allowance

Wiring & Electrical BOM

Planning estimate12V DC preliminary · 0/13 cable runs measured
Modular 12V system. 500 Ah · 800 W solar · 2,000 W inverter10 AWG: Array current ×1.25 (NEC 690.8 practice) at ~36V nominal, 3% drop over the 20 ft roof run.10 AWG6 AWG · 80A MRBF: Controller output 60A; fuse at 125% (80A) within 7" of the bus.6 AWG · 80A MRBF4 AWG · 70A MRBF: Victron Orion XS 12/12-50A DC-DC Charger on a 25 ft cab run uses 4 AWG. The terminals take 4 AWG at most, with a 70 A fuse. Use the charger manual.4 AWG · 70A MRBF6 AWG · 70A MRBF: Charger output 50A to the bus; fused at 70A.6 AWG · 70A MRBF3/0 AWG · 350A Class T: Main battery cables sized to the largest load (3000 VA (2,400 W) at 12 V, about 278 A). Class T 350 A within 7 inches of the battery terminal.3/0 AWG · 350A Class T3/0 AWG: 3000 VA (2,400 W) at 12 V is about 278 A. 3/0 AWG, protected by the Class T main.3/0 AWG8 AWG · 50A MRBF: Feeder for 6 branch circuits totaling ~37A; fused 50A (block max 100A).8 AWG · 50A MRBF12 AWG · 15A blade: 8.5A continuous load, 3% drop (critical) over ~8 ft; 15A blade fuse per manufacturer guidance. 14 AWG minimum on branch circuits by convention.12 AWG · 15A blade14 AWG · 7.5A blade: 5A continuous load, 10% drop acceptable (non-critical) over ~16 ft; 7.5A blade fuse per manufacturer guidance. 14 AWG minimum on branch circuits by convention.14 AWG · 7.5A blade14 AWG · 5A blade: 3.3A continuous load, 10% drop acceptable (non-critical) over ~16 ft; 5A blade fuse per manufacturer guidance. 14 AWG minimum on branch circuits by convention.14 AWG · 5A blade14 AWG · 15A blade: 5A load, 10% drop acceptable (non-critical) over ~16 ft; 15A blade fuse per manufacturer guidance. 14 AWG minimum on branch circuits by convention.14 AWG · 15A blade14 AWG · 10A blade: 6.8A load, 3% drop (critical) over ~8 ft; 10A blade fuse per manufacturer guidance. 14 AWG minimum on branch circuits by convention.14 AWG · 10A blade14 AWG · 15A blade: 8.3A load, 3% drop (critical) over ~8 ft; 15A blade fuse per manufacturer guidance. 14 AWG minimum on branch circuits by convention.14 AWG · 15A bladeLiFePO4 house battery, 50…500Ah @ 12VLiFePO4 house battery, 500 Ah (Battle Born heated class)Bus bars (+/−)or Lynx DistributorBus bars (+/−)4× Renogy 200W N-Type Rig…800W on the roof4× Renogy 200W N-Type Rigid Panels (800W array)Vehicle alternatorstarter battery / CCPVehicle alternatorVictron SmartSolar MPPT 1…60A planning output classVictron SmartSolar MPPT 150/60Victron Orion XS 12/12-50…Victron Orion XS 12/12-50A DC-DC ChargerVictron MultiPlus 12/3000…3000 VA (2,400 W) to 120 V ACVictron MultiPlus 12/3000/120 Inverter/Charger12V fuse blockbranch circuits, 100A max12V fuse blockDometic CFX5 55IM Fridge/…8.5ADometic CFX5 55IM Fridge/FreezerMaxxAir MaxxFan Deluxe 75…5AMaxxAir MaxxFan Deluxe 7500KLED Cabin Lights and Devi…3.3ALED Cabin Lights and Device ChargingUSB / 12V outlets5AUSB / 12V outletsShurflo 4008 Revolution W…6.8AShurflo 4008 Revolution Water PumpEspar Airtronic M3 D4L Di…8.3AEspar Airtronic M3 D4L Diesel Heater

Preliminary 12V DC schematic generated from versioned sizing rules (3% voltage drop on critical runs, fuses at 125% of load, wire ampacity ≥ fuse). See the per-run notes for reasoning. Verify against your components' manuals before building; this is a planning aid, not a certified electrical design.

Required before installation

  • Measure one-way cable routes before purchasing wire.
  • Confirm each selected battery, inverter, charger, controller, and load against its manufacturer manual.
  • Have the final installation reviewed and tested by a qualified RV/marine electrical professional.

Professional review domains

120V AC shore power and transfer switching · neutral-ground bonding and grounding · fuel, propane, and structural penetrations

Check before you buy

  • Battery BMS max discharge data is missing. Confirm it can continuously supply the 278A inverter load; bank amp-hours alone do not prove this.
  • Chassis ground: run the negative bus to a factory chassis point with cable equal to (or one size below) your largest battery cable. Community consensus sizing; verify against your chassis manual.

Wire

  • 14 AWG tinned marine wire (red + black)

    105°C insulation

    Quantity
    2 × 80 ft
    Notes
    includes ~20% routing slack
  • 4 AWG tinned marine wire (red + black)

    105°C insulation

    Quantity
    2 × 30 ft
    Notes
    includes ~20% routing slack
  • 10 AWG tinned marine wire (red + black)

    105°C insulation

    Quantity
    2 × 25 ft
    Notes
    includes ~20% routing slack
  • 6 AWG tinned marine wire (red + black)

    105°C insulation

    Quantity
    2 × 10 ft
    Notes
    includes ~20% routing slack
  • 3/0 AWG tinned marine wire (red + black)

    105°C insulation

    Quantity
    2 × 10 ft
    Notes
    includes ~20% routing slack
  • 8 AWG tinned marine wire (red + black)

    105°C insulation

    Quantity
    2 × 10 ft
    Notes
    includes ~20% routing slack
  • 12 AWG tinned marine wire (red + black)

    105°C insulation

    Quantity
    2 × 10 ft
    Notes
    includes ~20% routing slack

Fuses & protection

  • 80A MRBF fuse + holder

    Quantity
    1
    Notes
    mppt → busbar
  • 70A MRBF fuse + holder

    Quantity
    1
    Notes
    alternator → dcdc
  • 70A MRBF fuse + holder

    Quantity
    1
    Notes
    dcdc → busbar
  • 350A Class T fuse + holder

    Quantity
    1
    Notes
    battery → busbar
  • 50A MRBF fuse + holder

    Quantity
    1
    Notes
    busbar → fuse-panel
  • 15A blade fuse

    Quantity
    1
    Notes
    fuse-panel → load-fridge
  • 7.5A blade fuse

    Quantity
    1
    Notes
    fuse-panel → load-fan
  • 5A blade fuse

    Quantity
    1
    Notes
    fuse-panel → load-lights
  • 15A blade fuse

    Quantity
    1
    Notes
    fuse-panel → load-outlets
  • 10A blade fuse

    Quantity
    1
    Notes
    fuse-panel → load-pump
  • 15A blade fuse

    Quantity
    1
    Notes
    fuse-panel → load-heater

Distribution

  • Bus bar pair (+/−) or Victron Lynx Distributor

    rated ≥ main fuse

    Quantity
    1
  • 12-circuit fuse block with negative bus

    100A max

    Quantity
    1

Lugs & termination

  • Chassis ground cable + lug

    Quantity
    1
    Notes
    equal or one size below largest battery cable; bare-metal contact point
  • Tinned copper lugs (match gauge × stud: 3/8" mains, 5/16" holders, 1/4" fuse block)

    Quantity
    24
    Notes
    one per cable end, red/black adhesive heat shrink each
  • Adhesive-lined heat shrink, red + black assortment

    Quantity
    1 kit

Monitoring & switching

  • Battery disconnect switch (main positive)

    rated ≥ max continuous current

    Quantity
    1
  • Battery monitor shunt (main negative)

    Quantity
    1
    Notes
    ALL loads + chassis ground land on the load side

Hardware & misc

  • MC4 connector pairs + roof cable gland

    Quantity
    1 set
  • Wire loom / sheathing + cable clamps (every 18")

    Quantity
    per run layout
    Notes
    sheathing unlocks the 40"/72" fuse-distance allowances

Budget

Planned prices and allowances only. Any purchased subtotal below uses planned prices, not actual spending or receipts.

Components

$11,108

$0 purchased

Honest plan

$17,668

+ materials, small parts, tools

Upper end

$23,890

The high end adds a 20% contingency ($3,534) and $2,688 for a premium or heated battery.

Target

$35,000

$17,332 headroom

By category: purchased vs planned

Electrical
$0 / $5,509
Climate Control
$0 / $2,874
Kitchen
$0 / $1,317
Plumbing
$0 / $958
Sleeping
$0 / $450

Not itemized yet, but every real build pays it

  • Build materials (typical preset)lumber, ply, insulation, flooring, bed and cabinet structure, from itemized real builds. A larger van adds more lumber, insulation, and flooring.$4,749
  • Consumables & small parts (10% of components)fasteners, adhesives, sealant, connectors, blades, measured 4 to 17% of real builds$1,111
  • Tools (first-time builder)measured $390 to $1,070 in tracked builds. Reduce this if you already own tools.$700

System Requirements

Planning limits: resolve before purchase or installation

  • Part-time use retains full-day living estimates for occupied days. Confirm actual appliance use, refill cadence and off-grid duration before sizing products.
  • Your roof fits about 800 W. That covers about 2.8 kWh on a sunny day. The rest comes from driving or hookups.
  • You would use about 8 gal a day, so plan a refill about every 4 days.
  • Heater output is a preliminary volume rule only. Final sizing requires design temperatures, insulation/thermal bridges, glazing, ventilation, and infiltration heat-loss inputs.
  • DC-DC charger 50 A: about 650 Wh per hour of driving. Shore charging is about 80 A from the inverter-charger.
Daily Energy
2,850 Wh
same lifestyle estimate as your first numbers
Battery
500 Ah (6.4 kWh)
same size as your first numbers, at 12 V
Solar Array
800 W
Inverter
2,000 W
same class as your first numbers
Alternator charger
50 A
within about half the bank, or called out above
Off-Grid
2 days
Peak AC
1,800 W
coincident planning load
Fresh Water
30 gal
113.56230000000001 L
Grey Water
18 gal
68.13738000000001 L
Heating
11,137 BTU/hr
Diesel Forced-Air
Sleeping
Fixed Bed Lengthwise
Sleeps 2

Build Plan

632 DIY hrs52.7 wks @ 12 hrs/wk27 tasks · 6 phases
Penetrations & Roof Hardware4 tasks
47.91h DIY
31.93h Pro
Roof-mount solar panels + seal corner brackets
Skilled DIY
15.97h
Cut, mount, and seal roof ventilation fan
Skilled DIY
11.98h
Cut heater intake + exhaust holes through van floor
Skilled DIY
7.98h
Install grey water tank + drain line through floor
Skilled DIY
11.98h
Insulation & Vapor Strategy2 tasks
103.8h DIY
59.69h Pro
Apply sound deadener to the metal shell
Skilled DIY
31.14h
Insulate the walls, ceiling, and floor
Skilled DIY
72.66h
Rough-in (Electrical · Plumbing · Heater fuel)5 tasks
75.85h DIY
49.9h Pro
Install solar entry gland + run cables to charge controller location
Skilled DIY
11.98h
Mount DC-DC charger + wire alternator → house battery
Skilled DIY
23.95h
Wire vent fan to 12V switch
DIY OK
3.99h
Drop fuel tank + install standpipe pickup
Pro Recommended
19.96h
Run PEX/PE-X supply lines from tank to fixtures (rough-in)
DIY OK
15.97h
Walls, Ceiling, Subfloor3 tasks
145.32h DIY
88.23h Pro
Build the subfloor
Skilled DIY
41.52h
Skin the walls
Skilled DIY
62.28h
Skin the ceiling
Skilled DIY
41.52h
Cabinetry & Major Systems Install11 tasks
251.14h DIY
144.51h Pro
Plan and mount house battery
Skilled DIY
11.98h
Wire bus bars + main fuse + cabling to battery
Skilled DIY
7.98h
Mount inverter/charger + AC distribution wiring
Pro Recommended
15.97h
Mount MPPT charge controller + wire to battery bank
Skilled DIY
7.98h
Mount fridge in cabinet cavity + wire to fuse panel
DIY OK
11.98h
Cut counter opening + drop in cooktop + connect
Skilled DIY
11.98h
Mount heater unit + route ducting + run fuel line
Skilled DIY
23.95h
Mount pump + accumulator + final hookup
DIY OK
7.98h
Install LED Cabin Lights and Device Charging
DIY OK
5.99h
Build bed frame / platform
Skilled DIY
62.28h
Build and mount Galley Cabinet Run (driver side)
Skilled DIY
83.07h
Finishes & Commissioning2 tasks
7.98h DIY
5.99h Pro
Wire thermostat + prime fuel pump + commissioning
DIY OK
3.99h
Cut mattress to fit + install bedding
DIY OK
3.99h

Parts list & progress

The Components total above is the planning list, the same list your first numbers use for this build ($11,108). The parts below are example retailer prices, so they do not add up to that total.

This is a planning checklist, not a ready-to-buy shopping list. Selection, evidence review, purchase, and installation are separate. Owner-reported reviews and progress are not engineering certification. Recheck current readiness in the build before buying or installing. Prices shown are planned estimates, not actual spending. Private orders, receipts, documents, and notes are omitted.

Last updated Sep 29, 2026