One decision, start to finish
This is the heater decision from the example plan, a four-season, propane-free Sprinter 170 for two. Not a script: the constraint, the options, the tradeoff, the choice, and the check that is still open.
Different van? Get first numbers for yours, no account needed.
Sprinter 170, high roof
2 adults, longer trips, all four seasons, induction cooking and an indoor shower
- Payload reserve
- 1,026 lb
- Planning range 571 to 1,280 lb
- Battery, solar, and inverter
- Battery 500 Ah (6.4 kWh) · Solar 800 W · Inverter 2,000 W
- Sized for 2,850 Wh a day, 13 fused cable runs. Planning sizes. The parts list carries a 2,400 W continuous inverter in this class.
- Honest budget
- $17,668 to $23,890
- The high end adds a 20% contingency ($3,534) and $2,688 for a premium or heated battery.
- Parts list
- 15 parts
- $11,108 in the components total above
- Build order
- about 632 to 1,000 hours
- 27 tasks in 6 phases
Planning estimates to verify.
Open the full example planThe constraint
Where you start
“Two of us, long trips in every season, winters included. No propane on board, that's decided. The plan has 800 W of solar and a 500 Ah bank. So what heats the van?”
The trail
Five steps, one heater
Constraint
Winter trips, for two, no propane
Long trips in every season means real heat on real winter nights, not a space heater for shoulder season. Propane is off the table, which removes the most common answer. The plan's power is a 800 W roof array and a 500 Ah bank, sized for 2,262 Wh a day, so the heater has to live inside that.- 2 kW typical, 4 kW for very cold use. Volume screen 11,137 BTU/hr
- 2,262 Wh/day from 7 listed loads
- 500 Ah bank · 800 W array
Options
Two sizes of diesel heater, or electric
Three routes. A diesel air heater fed from the van's own fuel tank, in the 2.2 kW size or the 4 kW size. Or an electric heater running off the battery bank through the inverter.- 2.2 kW size: up to 7,500 BTU/hr
- 4 kW size: up to 13,650 BTU/hr
- Engine recommends: diesel forced-air
Tradeoff
Electric heat empties the bank
Electric heat sounds clean, but the numbers don't close. A 1,500 W plug-in heater would use the whole day's energy budget in about 1.4 hours, before the fridge or the cooktop get any. Of the two diesel sizes, 2 kW is the usual recommendation. 4 kW is for very cold use or light insulation.- 4 kW diesel heater: 5–42 W of electricity while running
- Its share of the daily budget: 200 Wh
Choice
Espar Airtronic M3 D4L
This plan picks the 4 kW size for colder nights. 2 kW would also be a normal choice. It taps the van's own diesel tank, so there is no second fuel to carry and no propane locker to build. The battery bank stays for the fridge, the lights and the laptops.- $2,399 sourced price, kit with controller
- Up to 13,650 BTU/hr. The volume screen is 11,137 BTU/hr, and 2 kW is still a normal choice
Still open
Open checkFinal size waits on the insulation
The volume screen is not a heat-loss calculation, and it is not a requirement. The insulation, the windows and the coldest night you plan for decide the final size, so the plan keeps the heater provisional until the insulation is chosen. The fuel pickup and the exhaust route are measured on the van before anything is cut.- Heater output is a preliminary volume rule only. Final sizing requires design temperatures, insulation/thermal bridges, glazing, ventilation, and infiltration heat-loss inputs.
“Still open” is not a failure. It is the plan being honest about what a spec sheet can't tell you.
What changed
What carried forward
- Electrical
- The heater gets its own fused circuit in the wiring plan (14 AWG wire, 15 A fuse) and 200 Wh of the daily 2,262 Wh budget. Planning estimates.
- Weight
- About 18 lb for the unit, kit and ducting, in a build that keeps 571 to 1,280 lb of payload in reserve.
- Budget
- $2,399 goes into the climate line, against a $35,000 target for the whole build.
- Build order
- 4 heater tasks land in the build sequence, from the floor openings and fuel pickup early on to commissioning at the end.
Read this
What this is not
Planning support, not a professional stamp. The numbers here are planning estimates from the example plan; prices change and specs get revised.
Verify with manufacturer documentation and a qualified professional before you buy, cut, or connect. Fuel and exhaust work in particular is the kind of job worth a professional's eye.