VanBuilder · Build Plan
Sprinter · 170 · High roof · Full-time living · four-season
Components
14
Estimated cost
$9,248
26% of $35,000 target
Printed
Sep 16, 2026
Planned prices and allowances only. Any purchased subtotal below uses planned prices, not actual spending or receipts.
Components
$9,248
$3,611 purchased
Honest plan
$15,373
+ materials, small parts, tools
With 20% contingency
$18,448
builders recommend 10–30%
Target
$35,000
$19,627 headroom
By category — purchased vs planned
Not itemized yet — but every real build pays it
Fit claims use the active vehicle profile, installed finish build-up, component dimensions, operating envelopes, and their recorded tolerances. Open the planner for issue evidence and explicit fixes.
2019–2026 Mercedes-Benz Sprinter Cargo 2500 170 High Roof — 3,814 lb payload
-736 lb–1,158 lb remaining
OEM profile + estimated curb weight · likely payload 3,414 lb–4,064 lb · planning weight band 2,906 lb–4,150 lb
To improve confidence
Where the weight sits (from placed spatial nodes)
797 lb is not spatially placed: Victron MultiPlus 12/2000 Inverter/Charger, 3× Renogy 200W Rigid Panels (600W array), MaxxAir MaxxFan Deluxe 7500K, Espar Airtronic S2 D2L Diesel Heater, Shurflo 4008 Revolution Water Pump, Victron SmartSolar MPPT 100/50, Victron Orion XS 50A DC-DC Charger, Duxtop 9600LS Induction Cooktop, Camplux 12V 2.6 gal Water Heater, Gear & supplies (2 × 300 lb). This weight is excluded from directional and axle claims, not silently assigned to a guessed zone.
| 2× Battle Born 100Ah LiFePO4 (200Ah bank) | 62 lb | from product specs |
| Victron MultiPlus 12/2000 Inverter/Charger | 25 lb | from product specs |
| 3× Renogy 200W Rigid Panels (600W array) | 86 lb | from product specs |
| Dometic CFX3 55IM Fridge/Freezer | 47 lb | from product specs |
| MaxxAir MaxxFan Deluxe 7500K | 16 lb | from product specs |
| Espar Airtronic S2 D2L Diesel Heaterest | 18 lb | unit + kit + ducting |
| Shurflo 4008 Revolution Water Pump | 4 lb | from product specs |
| Victron SmartSolar MPPT 100/50 | 3 lb | from product specs |
| Victron Orion XS 50A DC-DC Chargerest | 15 lb | weight unavailable; 15 lb planning allowance |
| Duxtop 9600LS Induction Cooktopest | 15 lb | weight unavailable; 15 lb planning allowance |
| 30 gal Fresh + 22 gal Grey Poly Tanksest | 15 lb | weight unavailable; 15 lb planning allowance |
| Camplux 12V 2.6 gal Water Heaterest | 15 lb | weight unavailable; 15 lb planning allowance |
| Fixed Queen Platform (rear, over garage)est | 15 lb | weight unavailable; 15 lb planning allowance |
| Fresh water, full (21 gal) | 176 lb | 8.34 lb/gal — RVIA counts fresh full |
| Water tanks (empty shells)est | 26 lb | ~0.7 lb per gal capacity, fresh + grey |
| Build materials (full-featured preset)est | 2,090 lb | insulation, floor, paneling, framing, cabinetry, bed — measured-build anchors; includes 1 selected structural item(s), not counted again |
| People (2 × 150 lb)est | 300 lb | FMVSS designated-seat assumption |
| Gear & supplies (2 × 300 lb)est | 600 lb | full-time allowance (measured builds carry more) |
Preliminary 12V DC schematic generated from versioned sizing rules (3% voltage drop on critical runs, fuses at 125% of load, wire ampacity ≥ fuse) — see the per-run notes for reasoning. Verify against your components' manuals before building; this is a planning aid, not a certified electrical design.
Required before installation
Professional review domains
120V AC shore power and transfer switching · neutral-ground bonding and grounding · fuel, propane, and structural penetrations
Check before you buy
14 AWG tinned marine wire (red + black)
105°C insulation
2/0 AWG tinned marine wire (red + black)
105°C insulation
10 AWG tinned marine wire (red + black)
105°C insulation
8 AWG tinned marine wire (red + black)
105°C insulation
12 AWG tinned marine wire (red + black)
105°C insulation
70A MRBF fuse + holder
70A MRBF fuse + holder
70A MRBF fuse + holder
250A Class T fuse + holder
60A MRBF fuse + holder
15A blade fuse
10A blade fuse
10A blade fuse
15A blade fuse
10A blade fuse
20A blade fuse
Bus bar pair (+/−) or Victron Lynx Distributor
rated ≥ main fuse
12-circuit fuse block with negative bus
100A max
Chassis ground cable + lug
Tinned copper lugs (match gauge × stud: 3/8" mains, 5/16" holders, 1/4" fuse block)
Adhesive-lined heat shrink, red + black assortment
Battery disconnect switch (main positive)
rated ≥ max continuous current
Battery monitor shunt (main negative)
MC4 connector pairs + roof cable gland
Wire loom / sheathing + cable clamps (every 18")
| Item | Qty | Notes |
|---|---|---|
| Wire | ||
| 14 AWG tinned marine wire (red + black) — 105°C insulation | 2 × 70 ft | includes ~20% routing slack |
| 2/0 AWG tinned marine wire (red + black) — 105°C insulation | 2 × 40 ft | includes ~20% routing slack |
| 10 AWG tinned marine wire (red + black) — 105°C insulation | 2 × 25 ft | includes ~20% routing slack |
| 8 AWG tinned marine wire (red + black) — 105°C insulation | 2 × 20 ft | includes ~20% routing slack |
| 12 AWG tinned marine wire (red + black) — 105°C insulation | 2 × 20 ft | includes ~20% routing slack |
| Fuses & protection | ||
| 70A MRBF fuse + holder | 1 | mppt → busbar |
| 70A MRBF fuse + holder | 1 | alternator → dcdc |
| 70A MRBF fuse + holder | 1 | dcdc → busbar |
| 250A Class T fuse + holder | 1 | battery → busbar |
| 60A MRBF fuse + holder | 1 | busbar → fuse-panel |
| 15A blade fuse | 1 | fuse-panel → load-fridge |
| 10A blade fuse | 1 | fuse-panel → load-fan |
| 10A blade fuse | 1 | fuse-panel → load-lights |
| 15A blade fuse | 1 | fuse-panel → load-outlets |
| 10A blade fuse | 1 | fuse-panel → load-pump |
| 20A blade fuse | 1 | fuse-panel → load-heater |
| Distribution | ||
| Bus bar pair (+/−) or Victron Lynx Distributor — rated ≥ main fuse | 1 | |
| 12-circuit fuse block with negative bus — 100A max | 1 | |
| Lugs & termination | ||
| Chassis ground cable + lug | 1 | equal or one size below largest battery cable; bare-metal contact point |
| Tinned copper lugs (match gauge × stud: 3/8" mains, 5/16" holders, 1/4" fuse block) | 24 | one per cable end, red/black adhesive heat shrink each |
| Adhesive-lined heat shrink, red + black assortment | 1 kit | |
| Monitoring & switching | ||
| Battery disconnect switch (main positive) — rated ≥ max continuous current | 1 | |
| Battery monitor shunt (main negative) | 1 | ALL loads + chassis ground land on the load side |
| Hardware & misc | ||
| MC4 connector pairs + roof cable gland | 1 set | |
| Wire loom / sheathing + cable clamps (every 18") | per run layout | sheathing unlocks the 40"/72" fuse-distance allowances |
This is a planning checklist, not a ready-to-buy shopping list. Selection, evidence review, purchase, and installation are separate. Owner-reported reviews and progress are not engineering certification. Recheck current readiness in the build before buying or installing. Prices shown are planned estimates, not actual spending. Private orders, receipts, documents, and notes are omitted.
This build uses earlier planning records. Purchase readiness and evidence review have not been established in this export.
Saved planning item · quantity and readiness not established
Purchased · owner-reported legacy status, not verified
Saved planning item · quantity and readiness not established
Saved planning item · quantity and readiness not established
Saved planning item · quantity and readiness not established
Purchased · owner-reported legacy status, not verified
Saved planning item · quantity and readiness not established
Saved planning item · quantity and readiness not established
Purchased · owner-reported legacy status, not verified
Saved planning item · quantity and readiness not established
Saved planning item · quantity and readiness not established
Purchased · owner-reported legacy status, not verified
Saved planning item · quantity and readiness not established
Saved planning item · quantity and readiness not established
Saved planning item · quantity and readiness not established
Saved planning item · quantity and readiness not established
Saved planning item · quantity and readiness not established
Saved planning item · quantity and readiness not established
Known planned item cost: $9,248